Pre-commissioning Tests (Done before energizing)
Routine Maintenance Tests (Periodic checks)
Type Tests (For design validation)
These tests verify that the transformer is safe and ready for operation.
Measures insulation health between windings and ground.
Test Equipment: Megohmmeter (500V, 1000V, or 2500V DC).
Acceptance Criteria:
Primary to Ground & Secondary to Ground: ≥1 MΩ (higher is better).
Primary to Secondary: ≥1 MΩ.
Checks for loose connections, broken strands, or high-resistance joints.
Test Equipment: Micro-ohmmeter or DC resistance bridge.
Acceptance Criteria: Compare with factory test results (deviation ≤ ±2%).
Verifies the transformation ratio of each phase.
Test Equipment: Turns Ratio Tester.
Acceptance Criteria: Should match nameplate ratio (±0.5% tolerance).
Ensures correct phase sequence (R-Y-B) and polarity.
Test Equipment: Phase sequence meter or oscilloscope.
Checks core integrity (detects shorted turns or core damage).
Test Method: Apply 10-25% rated voltage and measure current.
Acceptance Criteria: Should be balanced across phases (deviation < 10%).
Assesses insulation quality (moisture or contamination).
Test Equipment: PF/Tan Delta Test Kit.
Acceptance Criteria: Tan δ < 0.5% (new transformer).
Confirms correct phase displacement (30° steps).
Test Equipment: Vector Group Tester.
Conducted periodically to detect aging or faults.
Dielectric Strength Test (BDV > 30 kV for new oil).
Acidity Test (Neutralization value < 0.1 mg KOH/g).
Dissolved Gas Analysis (DGA) (Detects internal faults like arcing, overheating).
Identifies insulation defects.
Test Equipment: PD Detector.
Detects mechanical deformations (winding displacement, core issues).
Impulse Test (Lightning surge withstand).
Short-Circuit Test (Mechanical strength under fault).
Temperature Rise Test (Verifies cooling efficiency).
✔ De-energize & ground before testing.
✔ Use proper PPE (gloves, goggles).
✔ Follow lockout/tagout (LOTO) procedures.
Three-phase transformer testing ensures safe, efficient, and reliable operation. Routine checks prevent failures, while pre-commissioning tests verify installation correctness.
The above content is published by demiks, please specify, demiks is a substation equipment manufacturer, specializing in the production of high-voltage tester, transformer test equipment, circuit breaker test equipment, relay tester, SF6 gas analyser, cable fault tester and other products, if you have power test testing needs, please feel free to contact demiks power science and technology limited company or send an email! Give us: contact@demikspower.com